We at Daya Charan & Company provide specially designed Dozers ideal for railway construction projects. Indian Railway system is amongst the largest railroad network in the World. Railway construction and repairs of wear and tear of tracks, setup of new railway lines etc. for easy transportation and access to passengers over the huge network requires smooth operation.
We have executed several Railway projects
over the years with smooth dozer operation and working. Ballast
levelling, the even distribution or removal of ballast from beneath
railroad tracks. The track rail liners lift a stretch of track so the
dozer can quickly run the rake blade beneath it to level the ballast
underneath. While the track is lifted, work crews can easily inspect the
elevated ties and replace any that is worn.
Switching to and from the rake
configuration is fast and easy; the rake blade can be removed from the
dozer in approximately 15 minutes which means that the dozer can be
converted back to its normal configuration for other maintenance-of-way
tasks with very little downtime.
Daya Charan & Company
+917290049004
bulldozerenquiry@gmail.com
Source - https://www.dozer.in/bulldozer-for-railway-construction-work/
